Центр новостей

Philippine Supermarket BESS: Build a 30-Day Metering Plan Before You Request a Quote

What the Monthly Bill Leaves Out

Philippine Supermarket BESS: Build a 30-Day Metering Plan Before You Request a Quote

A record of load is a timed series of measurements of the power taken at the supply point of a building, kept together with the trading events, the circuit notes and the identity of the meter of the same period. Records may be required for one or more of the following purposes: – as an aid for designing electrical installation and checking its adequacy for load growth; – as a means of appraising the tariff for electricity applicable to the supply; – to control the maximum demand in relation to the chargeable capacity; – as evidence of the usage of energy and its pattern of change, in the context of energy management and accountability.

Choosing One Operating Objective

The design of an installation requires knowledge of the maximum demand on each circuit, and of the diversity in demand between circuits; this in turn demands the recording of current in each circuit separately, alongside the events of the period and the readings of the main meter, in order that the overall demand and the chances of growth can be judged. For tariff appraisal, the relation between maximum demand and total consumption is required, and the load factor; also the timing of the demand peak in relation to the charges for maximum demand on a time-of-day basis. For controlling the maximum demand it is useful to know which circuits are taking current at the time when the peak is approached. For energy management, the division of the total consumption between the circuits, or between groups of circuits, together with the ambient conditions of the period, is required. It follows that the more detailed are the observations of the circuits, the more uses can be made of the record; and that the events of trading at the times of readings are an essential part of the record.

Interval Data on One Clock

An interval record of load is a set of simultaneous readings of the demand on a number of circuits, separated by equal intervals of time during a period of observation. Interval records are necessary for the study of a complete installation, and convenient for any one circuit.

The intervals are to be chosen so that the readings can be taken and written down without hurry. The intervals need not be synchronous with the beginning of the hour; it is conventional, but not necessary, since the appearance of the load ‘peaks’ is not to be relied upon to an exact minute.

Walking the Panels

The clocks are to be checked at the start and the finish of each round.

Write down readings at the time of the round, without postponement of the entry (figures should be written down as they are observed, not memorised). Use one book for the purpose. Record the time at which each reading is made.

Begin with the main meter; then read all meters on one panel in turn, in a regular order kept on each occasion. Make the round the same way every time.

Do not interfere with the setting of any meter during the round.

Use a torch if the panels are in darkness. Make sure the panels are clean and the meters readable.

Circuit Groups and Refrigeration Duty

Where many circuits are to be recorded, they should be grouped in advance so that the readings can be made in a reasonable time. Each group must consist of circuits which are under a common control, or which supply apparatus of one type, or which supply apparatus which operates under a common regime. The groups are to be decided before recording begins, and written down in the record.

Circuits supplying the compressors of the refrigerating plant are to be recorded separately, so that the number of compressors in operation at each interval can be counted. The count of running compressors is evidence of the weather, and of the effect of changes in the shop upon the refrigeration duty: it assists the interpretation of the record.

Keeping the Difficult Days

The events of trading determine which days are to be kept out of the average. The record of each day is to be qualified by a note of the date, the day of the week, the hours of trading and the weather. It is the events of the day which determine the day’s record; the average of a number of days is not to be relied upon unless the days are of the same type.

A day of average daily trading need not be exactly typical of the week; but it shall be free of any event which is out of the ordinary course of trade, and shall have been observed throughout the hours of trading.

The Operating Duty Statement

In every case where the record is made for a definite object, a statement of the object is to be written down before the record begins: for example, ‘to find the maximum demand and the load factor of the installation for comparison with the tariff’ or ‘to determine the consumption of each circuit for the apportionment of energy charges’. The scope of the record, and the reason for the choice of circuits, should be given.

The record of events is to be kept by the observer, and is to include the beginning and the end of trading; the times of switching on and off of the several circuits; the times of the switching on of any load which is unexpected; the times of any interruption of the supply; the times of the rising and the setting of the sun, where these bear upon the lighting load. The record is to be annotated with any change of the regime of ventilation or heating; and with any change of the occupancy, such as the opening of a new sales area.

The Request for Quotation

Supporting project image

The maker’s commercial and industrial page names model EP215L-100K and gives cabinet particulars for rated AC power and system capacity; the opening sample of the record is 30 days of interval data.commercial and industrial ESS page

The Philippine Department of Energy has published an energy storage policy and energy efficiency implementing rules; how far either applies to a particular establishment is a matter for the operator and the adviser.updated energy storage policyenergy efficiency implementing rules

Errors to Look For

The operator must check the record for:

(a) a wrong time scale;

(b) a missing day;

(c) a flat top to the record (which masks a peak);

(d) a zero reading on one or more phases.

A phase can lose its supply through a blown fuse or a loose connection, and the load will be carried by the other phases. A zero reading on a phase is not always a fault of the meter.

The maker’s category page lists the product routes and the contact page carries the channel for a controlled package of site papers; the answer, with the assumptions it leaves open, belongs with the study.C&I storage categoryСтраница контактов EPOTR

Часто задаваемые вопросы

Is 30 days always enough?

It is an opening sample rather than a fixed rule. Where the trading pattern, the weather or the refrigeration load changes with the season, the measurement window is extended to cover those states.

Can a utility bill replace interval data?

Rarely. A bill gives the energy and the charges for a period, but it does not show when each peak began, how long it lasted, or which plant was running at the time.

Should every refrigeration circuit receive backup power?

Not by default. The backed-up set is chosen from food-safety requirements, the thermal behaviour of each room, the layout of the circuits, the restart sequence and an engineering review.

Does the nameplate capacity equal the energy delivered to the loads?

No. Usable limits, the reserve held for outage duty, conversion losses, auxiliary consumption and the temperature of the room all reduce what the plant finally delivers.

What makes a storage business case reviewable?

Every measured value points to a meter, a bill, a contract or a log, and each assumption is shown as a separate line instead of being buried in one savings figure.

Вывод

A storage study for a Philippine supermarket begins with time, not with the size of the cabinet. When the interval record, the operating events, the knowledge of the circuits, a defined reserve and the inputs of the business case are laid out together, bidders quote against the same duty. That gives the engineering and finance teams a firmer footing for judging whether storage suits the store and how it should be run.

Поделиться:

Фейсбук
Твиттер
Информация LinkedIn
Следующая
IP65 Home Battery Placement in Vietnam: A Handover Record for Installers

Содержание

    поиск

    Классификация

    Связанные новости

    Philippine Supermarket BESS: Build a 30-Day Metering Plan Before You Request a Quote
    Philippine Supermarket BESS: Build a 30-Day Metering Plan Before You Request a Quote
    IP65 Home Battery Placement in Vietnam: A Handover Record for Installers
    IP65 Home Battery Placement in Vietnam: A Handover Record for Installers
    Figure 1. EPOTR low voltage stack in a residential utility room. AI scene illustration; stack format only, not the HV2 model
    How to Plan a Stackable Home Battery Upgrade in Vietnam
    Figure 1. EPOTR EP1 cabinet in a hotel plant room. AI scene illustration, not a customer installation
    How Philippine Hotels Can Size a Battery for Peak Shaving

    Связанные продукты

    IP65 двухтерминальный 16-градусный круглый экран для хранения энергии - слева (1)
    IP65 — 16kWh Outdoor Low-Voltage LiFePO₄ Battery
    IP65 Круглый экран с углом обзора 32 градуса, накопитель энергии (1)
    32kWh High-Capacity Low-Voltage LiFePO₄ Battery
    круглый
    16kWh Low-Voltage LiFePO₄ Battery — IP20
    IP65 двухтерминальный 16-градусный круглый экран для хранения энергии - слева (1)
    IP65 — 16kWh Outdoor Low-Voltage LiFePO₄ Battery
    IP65 Круглый экран с углом обзора 32 градуса, накопитель энергии (1)
    32kWh High-Capacity Low-Voltage LiFePO₄ Battery
    круглый
    16kWh Low-Voltage LiFePO₄ Battery — IP20
    круглый
    Система хранения энергии для дома мощностью 10 кВт·ч

    Если вам нужна помощь, пожалуйста, свяжитесь с нами

    Независимо от того, есть ли у вас потребности в сотрудничестве, консультации по продукту или мнения и предложения, мы всегда с нетерпением ждем поговорить с вами.